top of page

CAMP MORENA BACKUP GENERATOR

Project Location

Camp Morena, Naval Base Coronado, CA

Award Type

Design-Build Contract

Client

NAVFAC Southwest

Delivery Type

Design - Build

Award Amount

1.03M

Project Status

Ongoing

NAVFAC Southwest

Project Description

Contract N6247325C1611 | Awarded Jan 2025 | Contract completion Jan 2027 | Self-performed 100% of construction | Interim CPARS: Satisfactory

Design-build replacement of the Camp Morena emergency generator, from design through stamped final drawings: demolition of the existing generator enclosure, generator and fuel tank; new 100 kW propane emergency generator and automatic transfer switch; underground propane piping, conduits and cables on a new concrete pad; new galvanized steel utility pole, main meter and service disconnect; secured chain-link enclosure with privacy slats and lockable gate; and a new concrete walkway and stairs with stem walls and landing. Electrical design by C&G Engineering.

© 2026 by W E S T Development, Inc. | SBA 8(a) Certified | CA License #1039957 (B, C10)
CAGE 816V1 | UEI CLW3KNMNTET5 | Office (760) 975-3630

bottom of page