B9716 WASH RACK SITE PREP & CANOPY
Project Location
Marine Corps Air Station, Miramar (MCAS)
Award Type
Single-Source Procurement/236220
Client
NAVFAC Southwest
Delivery Type
Design - Build
Award Amount
1.95M
Project Status
Complete

Project Description
Contract N6247324C3003 | Awarded Jul 2024 | Completed Jul 2025 | Self-performed 50%
Comprehensive design-build project for wash rack site preparation and canopy installation at Building 9716, MCAS Miramar, San Diego, CA. Project includes providing and installing two new Big Top Structures (105’x120’x45’ each), complete design, engineering, and survey; installation of new lightning protection system; 210’ trench drain at structure entrance; all labor, equipment, materials, bonds, overhead, and profit for site prep and canopy construction