B9716 WASH RACK SITE PREP & CANOPY

Project Location

Marine Corps Air Station, Miramar (MCAS)

Award Type

Single-Source Procurement/236220

Client

NAVFAC Southwest

Delivery Type

Design - Build

Award Amount

1.95M

Project Status

Complete

NAVFAC Southwest

Project Description

Contract N6247324C3003 | Awarded Jul 2024 | Completed Jul 2025 | Self-performed 50%

Comprehensive design-build project for wash rack site preparation and canopy installation at Building 9716, MCAS Miramar, San Diego, CA. Project includes providing and installing two new Big Top Structures (105’x120’x45’ each), complete design, engineering, and survey; installation of new lightning protection system; 210’ trench drain at structure entrance; all labor, equipment, materials, bonds, overhead, and profit for site prep and canopy construction